Calistoga EV Charging Stations at Community Center and Pool Project
Project Description/Scope of Work: The purpose of this project is to install Level 2 electric vehicle charging stations (EVCS), two spaces at the Community Pool served by one dual port station and and three spaces at the Fire Station served by one dual port station and one single port station. The work generally consists of hot mix asphalt (HMA) pavement, installation of new electric vehicle charging stations, conduit, pull boxes, and safety bollards, signs and striping.
Plan Holders
Date | Company | Contact |
10/27/23 11:59 am | Construct Connect | Rye Jumuad Tel: 323.602.5079 |
10/23/23 8:40 am | Construction Bidboard, Inc. 11622 El Camino Real # 100 San Diego, CA | 000 Plan Room Tel: 800-479-5314 |
10/23/23 8:40 am | Dodge Data and Analytics 2860 S State Highway 161 Suite 501 Grand Prairie, TX 75052 | 000 Plan Room Tel: 413-304-2008 Fax: 306-336-2767 |
11/14/23 9:39 am | GEMS Environmental Managment Services Inc. 1120 Willow Pass Court Concord, CA 94520 | Paula Tleimat Accounting Manager Tel: (925) 671-6822 Fax: (925) 671-7120 |
10/23/23 8:41 am | Marin Builders Exchange 660 Las Gallinas Avenue San Rafael, CA 94903 | 000 Plan Room Tel: 415-462-1220 |
10/23/23 8:38 am | North Coast Builders Exchange 1030 Apollo Way Santa Rosa, CA 95407 | 000 Plan Room Tel: 707-542-9502 |
10/23/23 8:41 am | Placer County Contractor's Association 10656 Industrial Ave Ste. 100 Roseville, CA 95678 | Plan Room Tel: 916-771-7229 |
11/14/23 1:46 pm | PLEMCo 1638 East Edinger Ave., Ste B Santa Ana, CA 92705 | Brad Rinehart CEO Tel: 7142616000 |
10/31/23 12:51 pm | Quantum Energy Services & Technologies, Inc 490 43RD ST OAKLAND, CA 94609 | derrick rebello President Tel: 4156378575 |